Councils / Wicklow
Planning applications in Wicklow
Every application Wicklow County Council received in the last 30 days, newest first. Open one for the full details, the documents and the decision.
Open Wicklow on the map
13,903 applications on record
New applications 68 in the last 30 days
Columns
| Address | Status | Received | Description | Reference | Decision due | Agent | Eircode |
|---|---|---|---|---|---|---|---|
| Roslyn, Blacklion, Greystones | Pending decision | 1. new two storey 4 bedroom dwelling comprising 182 sq.m. located to the side of existing dwelling, 2. block up existing vehicular and pedestrian entrances, 3. provide new shared vehicular entrance to serve item 1 above and existing dwelling, 4. connection to all public services, 5. new boundary treatments together with all associated ancillary works to facilitate the above | 2660903 | ||||
| Fauna, Donard, Co. Wicklow | Pending decision | dwelling, wastewater treatment unit and polishing filter, new well, new entrance onto public road and associate works | 2660902 | ||||
| Lathaleere, Baltinglass, Co Wicklow | Pending decision | 4 new dwellings, new entrance onto public road, new internal road, connection to all public services and associate works including roads, footpaths, boundaries and boundaries treatments, open spaces and landscaping, attenuation areas | 2660901 | ||||
| Prospect Lower, Newcastle, Co Wicklow | Pending decisionRetention | 4 agriculture sheds as built, 3 containers as built, canteen building as built, concrete areas and associate works | 2660900 | ||||
| Penny Lane, Main Street, Kilcoole | Pending decision | change of use of part of existing premises from commercial to residential [studio apartment], all necessary internal and external alterations / additions to facilitate same, connection to all existing services, all necessary ancillary works to facilitate this development | 2660899 | ||||
| Churchland, Tinahely, Co. Wicklow | Pending decision | new dwelling to rear of existing dwelling with access off existing entrance off public road with connection to all services sought and the provision of a new vehicular entrance off the public road to service the existing dwelling on site with revised front boundary wall details and all associated site works | 2660898 | ||||
| Threecastles, Manor Kilbride, Co. Wicklow | Pending decision | a new agriculture storage shed and associate works | 2660897 | ||||
| Ballyraheen, Tinahely, Co. Wicklow | Pending decision | (1), the renovation and extension to the existing dwelling, (2) a replacement on-site effluent treatment system, (3) the upgrading of the vehicular entrance and all associated site works | 2660895 | ||||
| Unit 2 Block 2, Springmount Square Newtownmountkennedy, County Wicklow | Pending decision | change of use of part of the approved commercial area (156 sq.m) to an off-licence use (40 sq.m) for the sale of alcohol for consumption off the premises, the remainder of the commercial area (116 sq.m) will be used as a shop / convenience store, with the proposed off-licence area forming part of the overall retail unit, the approved commercial area (156 sq.m) forms part of a previously approved application for Permission, Wicklow County Council Register Reference 21/731, An Bord Pleanála Reference ABP 314322-22, building 1 of the approved application for Permission is now referred to as Block 2 | 2660894 | ||||
| The Court, Foggie Field, Kilruddery Bray | Pending decisionRetention | (1) the retention of a laundry facility located within the existing porch at the entrance to the premises; (2) the retention of an existing storage shed located within the playground; and (3) the application also includes the retention of a new emergency access gate from the playground, as required in accordance with Fire Safety Certificate Ref. BC4944/2025 | 2660893 | ||||
| Cronelea, Shillelagh, Co. Wicklow | Pending decision | RED III Level 1- extension of the operational life of the existing Cronelea wind farm and associated infrastructure (as permitted pursuant to Wicklow County Council Planning Register Reference 01/4805) for a further period of 20 years from the date of the expiry of its current operational duration, no changes are proposed to the number or dimensions of the existing permitted wind turbines, the existing wind farm comprises: (i) four (4) wind turbines; (ii) associated turbine foundations and crane hard standings; (iii) 1.7 kilometres of on-site access tracks; and (iv) underground electrical and communications cabling, the development provides for the installation of an aviation warning light on turbines T2, T3 and T4, this planning application is accompanied by an Environmental Impact Assessment Report and an Appropriate Assessment Screening which include an assessment of the likely significant effects of the proposed development; both individually and in combination with the relevant off-site or secondary developments which will occur as a direct result of the development, including the development’s existing grid connection infrastructure which comprises an electrical substation and approximately 14km of 20kV underground electricity line located within the townlands of Cronelea, Ballymarroge, Laragh, Kilquiggin, Quigginroe, Killabeg, Coolkenna, Lumcloon, Killinure, Rath East, Rath, and Knockloe, County Wicklow; and Ballyvangour and Tullowphelim, County Carlow | 2660891 | ||||
| Slievecorragh, Hollywood, Co. Wicklow | Pending decisionExtension of duration | section 42 - extension of appropriate period – 21/1192, new single storey 4 bedroom dwelling, garage, new well, percolation area, new foul drainage and soil polishing filter system all to current EPA guidelines treatment, surface water soakaways, landscaping, altered entrance and all associated site work | 26206 | ||||
| Wool Green, Carnew, Co. Wicklow | Pending decisionRetention | retention for 1) change of use from a retail unit & ground floor residential area to coffee shop and 2) permission for retention of ground floor door to first floor accommodation with all associated site works at Wool Green, Carnew, Co. Wicklow | 2660888 | ||||
| Mizpah, Florence Road, Bray Co. Wicklow | Pending decision | modifications to the front and side (east) elevations, including alterations to existing window openings, the construction of new window openings, installation of decorative timber gable pediments to the front and provision of new timber posts to the porch; demolition of 2 no. existing chimney stacks; construction of a new vehicular entrance onto Florence Road, including new gateway and two new pillars to match existing pillars, to provide off-street parking for 2 vehicles at Mizpah with one parking space lost from the paid parking bay in front of the property; all along with associated site works and services above and below ground level at Mizpah, Florence Road, Bray, Co.Wicklow, A98 PA06 | 2660887 | A98 PA06 | |||
| Raheengraney, Clonegal, County Wicklow | Pending decision | a new dwelling house, onsite waste water treatment system, detached domestic garage, proposed driveway and vehicular access, and all associated site and boundary works | 2660885 | ||||
| 37 Burnaby Heights, Greystones, Co. Wicklow | Pending decision | The development will consist of (1) the replacement of the existing main roof with new raised roof incorporating habitable accommodation, (2) the addition of a dormer structure to the north elevation and
(3) north and south-facing rooflights & all associated site works. | 2660884 | ||||
| Oakfield, Bellevue Hill, Delgany | Pending decision | The development will consist of revision to a previously granted planning permission Ref 2460197. The revisions consist of change in dwelling type from two-storey dwelling to a new single storey dwelling, and changes to the proposed driveway and vehicular entrance design, together with all associated site works at ‘Oakfield’, Bellevue Hill, Delgany, Co Wicklow. | 2660883 | ||||
| Coollattin View, Coolroe, Coolboy Tinahely Co.Wicklow | Pending decision | for 2 no detached dwellings, connection to existing services, access via right of way and associated works | 2660882 | ||||
| Rosemarie Galtrim Park, Bray, Co. Wicklow | Pending decision | (1) The removal of the existing single-storey rear extension. (2) The construction of a new flat-roofed rear extension at ground-floor level, with the roof area serving as a balcony. (3) The construction of a new pitched-roof rear extension at first-floor level. (4) The provision of a new open glazed porch under the existing canopy to the front elevation. (5) Associated alterations to all elevations, including the provision of external wall insulation. | 2660880 | Eoin FitzGerald, 5a Quinsborough Road | |||
| Rathnew GAA Club, Seaview Heights, Merrymeeting Rathnew Co. Wicklow | Pending decision | Erect an 18m high telecommunications monopole structure carrying antennas, dishes and associated telecommunications equipment all enclosed by security fencing | 2660879 | John Corridan, HQ Entara, Market Lane | |||
| 57 Eagle Valley, Enniskerry, Co Wicklow | Pending decisionRetention | Retention permission is sought for alterations to the previously permitted single-storey side extension, comprising an additional [10] m² to the rear and [1] m² to the front. These additions have a combined floor area of [11] m², bringing the total floor area of the side extension to [47] m². The extension forms part of the existing dwelling. | 2660878 | Mark Davies, Arc Design, | |||
| Aughrim Upper, Aughrim, Wicklow | Pending decision | for permission for the construction of an agriculture entrance onto public road and associate works | 2660876 | Liam Kenna, Moneystown | |||
| Stephen Street, Dunlavin, Co Wicklow | Pending decision | alterations to existing front elevation ground floor windows of the Imaal Hall, Stephen Street, Dunlavin, Co. Wicklow | 2660875 | Vincent Cronin, Station Road | |||
| Calary Lower, Kilmacanogue, Wicklow | Pending decision | erection of new 315.5 sqm agriculture shed and associate works | 2660874 | Liam Kenna, Moneystown | |||
| Main Street, Avoca, Wicklow | Pending decision | change of use of existing commercial unit in existing building into a veterinary clinic, change of use of existing hairdressing section of unit in existing building into barber area and joining the existing barber area to the proposed barber area to make 1 unit, change existing window to a door on the front elevation of building and associate works | 2660873 | Liam Kenna, Moneystown | |||
| Ballard, Roundwood, Co. Wicklow | Pending decision | construction of a single storey extension to the front and side of the existing house, changes to all elevations, upgrade of effluent disposal system to current EPA standards and all ancillary site works | 2660872 | Eleanor Sheehan, slieveroe | |||
| No. 1 Ballinalea, Ashford | Pending decisionRetention | dwelling as constructed | 26204 | Deane Turner Associates, Block 6, Suite A | |||
| Gort na Mona, 2a Oldcourt Park, Bray | Pending decision | (a) demolition of single storey sun room to rear, (b) construction of single storey extension to front, side and rear, (c) raising of the roof ridge height through alteration of the roof profile, (d) alterations to existing fenestration, (e) thermal upgrade of building envelope by way of new external wall insulation system, and (f) all associated drainage, services and site development works | 2660870 | Piotr Alama, Santa Rita | |||
| Dunbar Road, Dunbar Lower, Wicklow Town | Pending decisionExtension of duration | section 42 - extension of appropriate period – 21/798 erect a two-storey dwelling, connect to existing services and open a new vehicular entrance to the north of the site and close an existing entrance to the south of the site along with all associated site development works | 26203 | OTE Solutions, Dublin Road | |||
| Broomhall, Rathnew, Co. Wicklow | Pending decision87 homes | revisions to the permitted development as per WCC grant Ref 25/60554 at Broomhall, Rathnew, Co. Wicklow for the following:
• Revised residential numbers from 87 no. units to 80 no. units (4 No. 1-bed, 14 No. 2-bed, 57 No. 3-bed, 5 No. 4-bed)
• Revision from 175 No. car parking spaces to 173 No. car parking spaces
• Revision to site boundary
• Revision of location to associated refuse store for Creche building
• Revisions to associated Refuse & Bicycle stores for residential units; hard and soft landscaping; communal open space; boundary treatments; and all associated site and development works above and below ground at lands in Broomhall, Rathnew, Co. Wicklow | 2660869 | Luis Reis, Suite 3, Eden Gate Centre, Eden Gate, Delgany, Co. Wicklow | |||
| 5 Arch Villa, Greystones | Pending decision | alterations to front, sides and rear facades, conversion of existing attic over original house & new skylights to roof, new pitched roofed first-floor extension to existing single-storey rear extension including new skylights & oriel windows and associated site works | 26200 | Ronan Rose Roberts Architects, Morton's Lane | |||
| 15 Woodstock Ballycrone, Ballycrone, Kilcoole | Pending decisionRetention | retention of 2 skylights to the front of the existing dwelling at roof level serving previously converted attic storage space | 2660867 | FRANK BRENNAN, 62 RIVERSIDE GROVE | |||
| Tinakilly, Rathnew, Co. Wicklow | Pending decision223 homes | for a Large- Scale Residential Development, comprising amendments to a previously permitted Large-Scale Residential Development (WCC Ref. 2360219 and ACP Ref. ABP 322476-25) The proposed development comprises: Amendments to elevations, floor plans, sections, materials and finished floor levels of the following permitted 1-2 storey house types: 21 no. House Type, 4 no. House Type Q2d, 4 no. House Type R2a, 14 no. House Type R2d , 37 no. House Type M1, 5 no. House Type N2a, 17 no. House Type O1, 3 no. House Type 01b, 1 no. House Type 02a, 1 no. House Type 02b, 2 no. House Type P2a and 2 no. House Type W2a. Amendments to elevations, floor plans, sections, materials and finished floor levels of the following permitted 3 storey duplex unit types: 2 no. Duplex Type V21a-2, 2 no. Duplex Type V21a-3, 4 no. Duplex Type V21c-2, 4 no. Duplex Type V21c-3, 2 no. Duplex Type V21d-2 and 2 no. Duplex Type V21d-3. Amendments to elevations, floor plans, sections, materials and finished floor levels of all apartment units provided within the permitted 4 storey apartment blocks – Block 01, Block 02 and Block 03 at ground to third floor level. No additional units are proposed by the subject application. The proposed development also provides for all associated site development works and services provision above and below ground, reconfiguration of internal access roads and footpaths, and amendments to hard and soft landscaping and car parking areas to facilitate the unit type changes. All other site development works will remain as permitted under WCC Ref. 2360219 and ACP Ref. ABP-322476-25 | 2660866 | Brock McClure Brock McClure, 63 York Road | |||
| Monastery, Enniskerry, Co. Wicklow | Pending decision | the proposed construction of a new dwelling house, vehicular access, and all associated site
and boundary works. The proposed development is located within the vicinity of Monastery House which is listed as a Protected Structure in the current Wicklow County Development Plan | 2660865 | Angus Black, 20 | |||
| Humewood townland, Kiltegan | Pending decision | dwelling, waste water treatment system to EPA standards, garage and associated works | 26199 | Eugene Copeland, Suite 14 Block 1 | |||
| Raheen, Baltinglass, Co Wicklow | Pending decision | demolition of existing garage & domestic store and the construction of new single story side extension, along with all associated site and landscaping works | 2660864 | Eric Osborne, Rathanna | |||
| Ballykilmurry, Kiltegan, Co.Wicklow | Pending decisionRetention | as constructed dwelling and garage, retention for relocation of effluent treatment system and retention permission for revised site boundaries | 2660863 | Padraig Clancy, Rednagh Road | |||
| Castlefield, Fassaroe Lane, Bray | Pending decisionRetention | retention permission is sought for as-built dwelling comprising:
(a) Alterations to the character of the roof element of the porch on the front / northern elevation;
(b) Construction of a new single storey extension of 73m² to the rear / southern elevation;
(c) Construction of a garage / shed
(d) Construction of an above ground level walled swimming pool in the rear garden.
(e) Alterations to the site boundaries and a slight repositioning of the house from the location permitted. | 2660862 | Mark Davies, Arc Design, | |||
| Sage Cottage, Lugduff, Tinahely | Pending decisionRetention | retention of change of roof type from a flat roof to a pitched roof over extension to the side of original dwelling at “Sage Cottage”, Lugduff, Tinahely, Co Wicklow | 2660861 | Thomas Buttle, Main Street | |||
| Sparrow Road, Dunlavin Upper, Co Wicklow | Pending decision | construction of a single-story 3-bedroom bungalow, domestic garage, septic tank & percolation area and all ancillary site works necessary | 2660859 | Peter McFarlane, Rahan Road | |||
| Mount Temple, Russborough Blessington, Co. Wicklow | Pending decision | 1. The demolition of an existing single-storey wing containing the kitchen, utility room and office; 2. Internal alterations and reconfiguration of the existing dwelling at ground and first-floor levels; 3. The change of use and conversion of an existing single-storey stable building to provide a one-bedroom guest suite; 4. The construction of 2 no. first-floor extensions over existing ground-floor accommodation, together with associated internal alterations, to provide 4 no. bedrooms at first-floor level; 5. The construction of a single-storey extension to the south of the main dwelling, providing an open-plan kitchen, pantry, boot room and bathroom; 6. The construction of a detached storey-and-a-half outbuilding providing a games room, domestic office and garage at ground-floor level, with a multipurpose studio space at attic level; 7. The construction of a detached single-storey gym building; 8. The formation of a landscaped parking courtyard, together with associated patio areas, landscaping and gardens to the east, west and south of the existing dwelling; 9. The installation of a new wastewater treatment system to serve the proposed development; and 10. All associated site development, drainage, landscaping and ancillary works | 2660858 | Kevin Coughlan, Number 10 Design | |||
| Fatima House, Quinsborough Road, Bray | Pending decision30 homes | planning application for permission for amendments to previously approved grant of planning permission (An Bord Pleanála ref. ABP-318016-23 dated 18th October 2024) for development comprising the demolition of the existing single / two storey detached derelict building and for the construction of a detached six storey mixed use building with lift and stairwell element at roof terrace level, with a gross floor area of circa. 3037m sq., consisting of civic / community use and 30 no. apartments (comprising: 10 no. 1 bed/ 2 person, 10 no. 2 bed/ 3 person, 5 no.2 bed/ 4 person & 5 no. 3 bed 5 person apartments) and all on and off site development works and boundary treatments on site of circa. 0.079 Ha. at Fatima House, Quinsborough Road, Bray, Co. Wicklow, A98ED21 | 2660857 | Brian O'Flanagan, F1, Centrepoint Business Park | A98 ED21 | ||
| Kilcoole Industrial Estate, Creowen Rd Creowen, Kilcoole | Pending decision | the importation of soil infill from the source site, for use in levelling the lands at proposed development site | 2660856 | Kim Dreyer, Dreyer Associates Ltd | |||
| 5 Annabasky Glen, Enniskerry, Co. Wicklow | Pending decision | games room and habitable structure located in the paddock adjacent to the existing back garden along the southern boundary.
The structure will have a 4m high pitched roof, external dimensions 41.65m2 and internal dimensions 36.2m2. Finished in timber cladding with a QuadCore KS1000RW LEC Roof Panels with all associated service connections and landscaping works | 2660855 | Ingrid Smyth, 22 Oscar Square, | |||
| Merginstown, Dunlavin, Wicklow | Pending decision | construction of a new dwelling, garage, wastewater treatment unit and soil polishing filter, new well, new entrance onto public road and associate works | 2660854 | Liam Kenna, Moneystown | |||
| Uppertown, Dunlavin, County Wicklow | Pending decisionRetention | consists of:
a) Extensions to side and rear elevations,
b) Increase in the floor area at ground floor level,
c) Conversion of the attic into a habitable space, including the provision of rooflights and dormer windows,
d) Addition of a bay window at ground floor level and,
e) Addition of a canopy over the entrance to the dwelling and all associated site works and services | 2660853 | Furey Consulting Engineers Ltd., Olde World Cottage | |||
| Ballycore Townland, Grangecon, Co. Wicklow | Pending decision | 1) Proposed New Sand and Gravel Pit Development with associated ancillary facilities within a planning application area of c. 20.1 hectares.
2) Extraction of sand and gravel (dry working) over an area of c. 14.3 hectares with processing and washing of material on site (mobile plant and closed loop water recycling system with associated silt storage lagoons 1,952.25m2), and all ancillary works and structures.
3) Site facilities compound consisting of prefabricated welfare facility (canteen/changing room/WC) c.21m², septic tank/WWTU and percolation area, bunded fuel storage and refuelling pad with hydrocarbon interceptor, weighbridge and prefabricated office/WC c.21m², wheelwash, water supply borehole, perimeter berms, vegetation planting and fencing.
4) Provision of new site access via a splayed entrance priority junction onto the R747 regional road and internal hardcore access road/track between the entrance and the pit working area with relocation of the existing percolation area granted under P. Ref. 14/1370.
5) Revised access arrangements to the existing agricultural farmyard onto the R747 regional road.
6) Provision of surface water management infrastructure to control and treat surface water runoff at the site entrance, internal hardcore access track and site facilities compound area via a series of french drains, silt traps, hydrocarbon interceptors and infiltration soakaway features.
7) Provision for the removal of hedgerows and replacement with stockproof fencing and management of hedgerows on third-party lands to the western side of the R747 to improve forward visibility of traffic travelling north on the R747 road.
8) The proposed extraction operational period is for 15 years plus 2 years to complete restoration (total duration sought 17 years).
9) Restoration of the residual lands to a combination of ecological habitat and agricultural afteruse | 2660852 | Shane McDermott, 7 Dundrum Business Park | |||
| Rose Cottage, Brockagh, Glendalough | Pending decision | single-storey, pitched-roof sun-room/observatory with glazed walls and internal modifications to facilitate same. The proposed sun-room/observatory to be an extension of the existing cottage located to the front (south) side of the cottage | 26198 | c/o Anthony O'Beirne,, 18, Rathdown Avenue, | |||
| Ballycurry House, Ashford, Co. Wicklow | Pending decision | change of use of 2 no. cow barns to 2 no. 1 bedroomed, self-contained dwelling units, installation of waste water treatment system and associated site works at Upper Yard, Ballycurry House, Ashford, Co. Wicklow | 26197 | Peter Roberts Architects, 6 Clarinda Park North | |||
| 7 Cherry Glen, Delgany Wood Delgany, Co. Wicklow | Pending decision | (1) a new roof profile with 3no. front-facing rooflights and (2) construction of an attic conversion with a rear-facing dormer roof extension and all associated site works | 2660850 | Graham Fitzpatrick, No.1 Brickfield Cottages, Brickfield Lane | |||
| Donard Demense West, Donard, Co. Wicklow | Pending decision | construction of 10 No. two storey houses (8 No. 3 Bedroom semi-detached house in 4 blocks and 2 detached 4 bedroom houses), entrance, landscaping, connection to public foul sewer and all associated site works | 2660849 | Derek Whyte, Great Connell | |||
| Ballinroan Lower, Kiltegan, Co. Wicklow | Pending decision | dwelling, waste water treatment system to EPA standards, entrance and associated works | 26196 | Alphaplan Design, Suite 14, Block 1 | |||
| 83 Wheatfield, Bray, Co. Wicklow | Pending decision | alterations and extension to the existing two storey
semi-detached house to include, a new two storey side
extension, a single storey rear extension, demolition of an
existing garden shed and associated site works.at 83
Wheatfield, Oldcourt, Bray, Co. Wicklow, A98 F991 | 2660847 | A98 F991 | |||
| Coolkenna, Shillelagh, Co. Wicklow | Pending decision | proposed change of design to that previously granted planning permission under Planning Reference 24/60102, the development will consist of the renovation and extension of the existing single-storey detached dwelling, together with the demolition of a section of the existing kitchen located to the south side of the existing dwelling.
The development will also include the installation of a proprietary wastewater treatment system and new polishing filter, together with all associated ancillary site development and landscaping works | 2660846 | MORE Architecture, Unit 12 Castle House | |||
| Castlerudderry, Stratford On Slaney, Baltinglass | Pending decision | the importation of approximately 55,000 tonnes of clean soils and stone as by product over an area of approximately 2.5ha to infill and level the site in order to improve existing agricultural lands, clean soil and stone will be imported under Article 27 of European Communities (Waste Directive) Regulations 2011, as amended, a period of 5 years duration is requested to import materials and to complete restoration and seeding of the lands | 2660844 | Ruth Treacy, WSP Ireland Consulting Ltd | |||
| Reynoldstown Park, Boleynass Lower, Ashford | Pending decisionRetention | alterations to size of as constructed underground slatted slurry & soiled water storage tanks (which were originally granted planning permission under Planning Reference No: 19/123) and for retention permission of existing extended livestock shed consisting of feeding area for cattle on an underground slatted slurry storage tank and all associated siteworks | 2660842 | Maeve D'Arcy, One Creamery Square, Newtownshandrum | |||
| Tonlegee, Brittas Bay, Co. Wicklow | Pending decision | dwelling, waste water treatment system to EPA standards, and associated works | 26195 | Alphaplan Design, Suite 14, Block 1 | |||
| Main Street, Aughrim, Co. Wicklow | Pending decision | ''Part 8 - submissions should be made to the relevant department as specified on the site notice ( not the planning department )'' - construction of a new public library and community garden, comprising part single storey, part two storey building with reception area, loan desk, IT space, bookstore and reading areas, children's library, sensory room, public access meeting room and study spaces and changing places wheelchair accessible WC, site works will include selective demolition of the non-original parts of the front boundary wall to Main Street, conservation based repairs to the existing masonry pedestrian access gate to the rear of the site on Mill Lane, provision of vehicular / bicycle parking, connection to all public services, surface water treatment in accordance with SUDS and the creation of a biodiverse sensory garden with native Irish flora, all on site | 26194 | ||||
| 2 Glendale Drive, Bray, Co.Wicklow | Pending decision | amendment to previously approved planning permission [26/60345] to increase the area of the permitted single-storey rear extension (which involved the removal of an existing conservatory and construction of a new single-storey extension to the rear of the existing dwelling), together with all associated and ancillary site works | 2660841 | Jerome Anglin, Lonsdale | |||
| Vartry Waterworks, Roundwood Oldtown, Knockfadda Newastle Upper | Pending decision | 10-year planning permission for the Vartry Security of supply project at the existing Vartry waterworks site south of the Vartry reservoir in the townlands of Roundwood in the electoral division of Oldtown, and Knockfadda in the electoral division of Newcastle Upper, County Wicklow, the proposed development consists of, i) 60 megalitres treated water storage in two new 30 megalitres capacity structures, ii) a new underground dichlorination chamber, iii) a permanent pre-cast concrete bridge over the Vartry River on existing bridge abutments, iv) solar photovoltaic panels installation on both reservoir roof areas, v) a temporary storage area for excavated material, vi) ancillary works including, a. water supply pipes, b. surface water drainage, c. temporary lighting during the construction stage only, d. temporary compound area for the construction period, e. hardstanding adjacent to the existing Callowhill Pumphouse, f. extension of internal access road to the inlet / outlet chamber of the reservoirs and, g. associated landscaping works | 2660840 | Laurie McGee, Unit E4, Nutgrove Office Park | |||
| Wren Cottage, Preban, Tinahely | Pending decisionRetention | demolition of single storey cottage and the construction of a replacement dormer style cottage on the existing footprint, upgrading of septic tank & and all associated site works | 2660839 | James Kealy, Carlow Gateway Business Centre | |||
| Dunbur Upper, Wicklow Town, Co. Wicklow | Pending decisionRetention | extensions comprising sunroom at rear and self contained living unit to side | 2660837 | Michael Connolly, Wicklow Enterprise Centre | |||
| South Quay, Wicklow Town, Co Wicklow | Granted | section 254 licence - scaffolding | 26193 | ||||
| Tree Tops, Ballymacahara, Ashford | Pending decision | single storey sonservatory to side of dwelling, domestic garage, and 1.8m high V mesh fence to roadside boundary, and associated works | 26192 | Alphaplan Design, Suite 14, Block 1 | |||
| Knocknashamrogue, Knockananna, Co. Wicklow | Pending decision | the construction of a new dwelling, wastewater treatment unit and soil polishing filter, new well, upgrading existing entrance onto laneway which leads to public road and associate works | 2660834 | Liam Kenna, Moneystown | |||
| Carrigeenshinnagh, Lough Dan Roundwood, County Wicklow | Pending decision | the rebuilding of three derelict cottages and to construct one additional cottage to create cluster of four cottages in traditional design for use as visitor accommodation /short term holiday accommodation, the development will discharge to a newly constructed waste treatment system, the development will be accessed from the existing farm entrance | 2660833 | Tony Manahan, Manahan Planners | |||
| Nordwich, Brittas Bay, Co Wicklow | Pending decision | proposed new polishing filter to EPA standards, and associated works and Retention Permission for rear extension to dwelling, upper level landing with access doors to desk, upper level deck to rear of dwelling, double doors in place of original windows to front of dwelling , vine frame to front of dwelling, polytunnel, closed loop bathing pool | 26191 | Alphaplan Design, Suite 14, Block 1 | |||
| “Salinas” Knockfadda, Roundwood, Co. Wicklow | Pending decisionRetention | single storey extension to the rear of existing dwelling, detached domestic garage (with home office over) to side existing dwelling & detached shed to front of existing dwelling | 2660831 | Emmett Tolan, 5 Foxgrove, Townparks |
Other councils
- Carlow 4,642
- Cavan 6,351
- Clare 11,127
- Cork City 38,200
- Cork County 128,028
- Donegal 21,825
- Dublin City 40,187
- Dún Laoghaire-Rathdown 38,768
- Fingal 20,335
- Galway City 3,486
- Galway County 19,166
- Kerry 13,339
- Kildare 51,265
- Kilkenny 8,896
- Laois 8,130
- Leitrim 2,138
- Limerick 12,903
- Longford 2,896
- Louth 10,790
- Mayo 11,464
- Meath 73,571
- Monaghan 6,262
- Offaly 6,751
- Roscommon 6,482
- Sligo 4,663
- South Dublin 33,325
- Tipperary 81,701
- Waterford 10,192
- Westmeath 6,227
- Wexford 17,826
From the National Planning Applications dataset and each council's own planning portal, refreshed every night. Check dates and decisions on the council's portal before you rely on them. About PlanViewer